Detailed Photovoltaic Inverter

Detailed Photovoltaic Inverter

Photovoltaic inverters generally include power station photovoltaic inverters, string photovoltaic inverters, and micro-inverters. Power station type photovoltaic inverter, power range from 30KW-1000KW, even larger. Mainly used in large commercial roofs, industrial plants, and large-scale ground photovoltaic power plants. Power station PV inverters are mainly based on a three-phase bridge circuit topology, and include both transformerless and transformer types.

String type photovoltaic inverter, power range 1KW-30KW, mainly used in residential roof and some small commercial roofs. The string-type photovoltaic inverter single-phase products mainly consist of a boost circuit and a single-phase transformerless topology, and the three-phase products mainly include a boost circuit and a three-phase three-level transformerless topology.

The power of the micro-inverter is 200W-500W, which is mainly applied to curtain walls, window sills, and small roofs. The micro-inverter can be used with a single component structure to individually track the maximum output power of each component for optimal performance. In addition, the problem of shielding can also be improved and the efficiency and reliability of the solar photovoltaic system can be improved.

PV inverter main technical indicators

The conversion efficiency of photovoltaic inverters is demanding, and the level of conversion efficiency will directly affect the amount of electricity generated by the solar power system during the life cycle. According to different models, the conversion efficiency of international first-class brand products can reach more than 98%. The high-power photovoltaic inverter can achieve a conversion efficiency of 98.7%, and the maximum power tracker (MPPT) efficiency can reach 99.9%.

The photovoltaic inverter has a long service life and high reliability. The design life of photovoltaic power generation system is generally about 20 years, so the design life of photovoltaic inverters needs to reach a relatively high level. At the same time, if the photovoltaic inverter fails, it will cause the photovoltaic power generation system to stop and bring economic losses. Therefore, high reliability is an important technical indicator of photovoltaic inverters.

The DC voltage range of the photovoltaic inverter is to be wide and meets the grid connection requirements. In practical applications, a plurality of solar battery modules are connected in series to obtain a higher DC voltage, which is input to the photovoltaic inverter after multiple sets of parallel connection. Different power, different voltage components, and different combinations of series and parallel schemes require that the PV inverter be able to adapt to different DC voltage inputs. Therefore, the DC operating voltage of PV inverters should be wide to meet the different needs of customers. The current output at the same time can not cause impact on the power grid and meets the grid connection requirements.

Graphite Electrode, mainly in petroleum coke, needle coke as raw material, coal tar pitch as a binder, calcined, ingredients, mixed kneading, pressure, roasting, graphitization, machining and made in the arc furnace in the form of arc The energy can be divided into ordinary power Graphite electrode, High Power Graphite Electrode and Ultra High Power Graphite Electrode according to its quality index.



Graphite electrode transport

1, graphite electrode in the long-distance transport to be covered with anti-rain Pengbu.

2, with lifting machinery unloading wooden box packaging electrodes, you must use the wire rope, not directly hook the electrode steel packing belt for lifting.

3, in order to protect the electrode end and thread, not directly with hook hook electrode hole hanging electrode.

4, loading and unloading joints box, you should gently take to prevent damage to the thread.


 Second, the graphite electrode storage

1, the electrode should be stored in a clean, dry place; temporarily do not use the electrode and connector, do not remove the packaging, to prevent dust, debris fall into the thread or electrode hole, affecting product docking accuracy.

2, open field stacking electrodes, must be covered with rain pants. In the case of

3, the electrode in the Treasury storage to be placed neatly, the electrode stack on both sides to pad well, to prevent the cartoons.

4, bulk electrode stacking height is usually not more than 2.8 meters, the height of the box electrode should not be more than 4 layers.

5, the temperature of the place where the joints should be stored should not be too high to prevent the asphaltene joint bolt melting.


Third, the graphite electrode connection operation


 1, by the wet electrode, before use to dry.

 2, remove the spare electrode hole on the foam protective cap, check the electrode hole thread is complete.

 3, with no oil and water compressed air cleaning spare electrode surface and hole thread; to avoid the use of wire or metal brush cloth cleaning.

 4. Do not touch the threads in the electrode holes where the joint is carefully screwed into one end of the backup electrode (it is not recommended to insert the connector directly into the electrode that is replaced on the furnace).

 5, the electrode spreader (recommended the use of graphite material spreader) screw into the other side of the electrode electrode electrode hole.

 6, lifting the electrode, the mat soft objects to the bottom of the alternate electrode assembly to prevent the ground to break the joints; with a hook into the spreader after the lifting ring, lifting the electrode to be smooth, to prevent the electrode from the B-loose Off or collide with other fixtures.

 7, the spare electrode hanging to the top of the electrode to be connected to the electrode hole slowly after the fall; rotating the backup electrode, so that the screw hook and the electrode with the rotation down; in the two electrode end distance 10-20mm, again with compressed air Clean the two ends of the electrode and the exposed parts of the joint; in the final complete discharge of the electrode, not too much, or because of violent collision, will lead to electrode holes and joints of the thread damage.

8. Tighten the backup electrode with a torque wrench until the ends of the two electrodes are in close contact (the correct connection of the electrode and the connector is less than 0.05 mm).


Fourth, the graphite electrode in the use of the precautions

1, the electrode holder should be caught in the top of the cord outside the cordon, otherwise easily lead to electrode break. The contact surface of the gripper and the electrode should always be cleaned to maintain good contact with the electrode, and the gripper cooling water jacket should be kept leaking. In the case of

2, the electrode connection found cracks exist to identify the cause, to eliminate the gap before use.

3, connecting the electrode, found that the phenomenon of joint peeling off, to fill the joints and then connect the bolt.

4, the electrode should be used vertically, to avoid tilting operation, in particular, can not be connected to a group of electrodes placed horizontally, so as not to break.

5, to the furnace into the charge, the bulk material should be installed near the bottom of the furnace to reduce the collapse of the large pieces of charge impact electrode.

6, smelting, should avoid a large number of insulation material stacked in the electrode just below, so as not to affect the use of electrodes, or even electrode break.

7, the electrode in the rise or fall, should avoid touching the lid, resulting in electrode damage.

· 8, in the smelting site, to avoid slag splashing to the site of the electrode or connector threaded buckle, damage the thread accuracy.

 


 

Graphite Electrode


 


Graphite Electrode

Graphite Electrode,Discharge Graphite,Graphene Battery,Carbon Graphite Electrode

Fengcheng Ruixing Carbon Products Co., Ltd , http://www.lnfcrxts.com

Posted on