Acceptance of blank house should pay attention to eight points

There are only doors and frames in the house with no doors, and the room where the wall surface is only treated as a foundation and not surface treated is called the “growth room.” Although the rough house has passed the acceptance inspection of the relevant department, the buyers are turning the rough house into self-identity. Before space, you need to understand the acceptance criteria of the rough house. In accordance with the usual ... 80 after the small husband and wife marriage, petty marriage, romantic mood, fashion show, a member of the exclusive cash discount, Mediterranean style blue + white, mosaic, even for home art, young hot mom 50,000 to create two home 1 shop Cash discount voucher · Floor heating is not afraid of the cold this winter · Small apartment mixes the new trend · 200,000 luxury to create 95 flat space · Dulux paint cost-effective big PK · TV wall small space big content

There are only doors and frames in the house with no doors, and the room where the wall surface is only treated as a foundation and not surface treated is called the “growth room.” Although the rough house has passed the acceptance inspection of the relevant department, the buyers are turning the rough house into self-identity. Before space, you need to understand the acceptance criteria of the rough house. According to the usual standards, the rough house needs to be checked in the following areas when the house is delivered:
1. All exterior finishes, including balconies and rain covers, shall be completed according to design documents.
2. Common parts, public facilities, various pipelines (supplies, platoons, rainwater, warmth, heat), electrical equipment (distribution boxes, cabinets, plates, sockets, switches, lamps, etc.) shall be completed in accordance with design documents. , and complete various test items as required.
3, all kinds of pipelines should also be carried through the water, pressure test, pass the ball test and commissioning of heating and thermal engineering acceptance work.
4. The roofing project will carry out water storage and watering tests.
5. Where prefabricated floor slabs or cast-in-place roofs are used in each room within the door, it shall be done without plaster and leveled with putty to achieve dense and no cracks on the board seams, and shall be smooth and error-free. The surface shall be smooth and the color shall be substantially uniform. Straight line angle. The concrete on the ground floor of each room within the door should be flat and compacted to achieve a firm bond and no cracks.
6, the room with waterproof requirements should be strictly in accordance with the waterproof layer, protective layer of the building requirements to plan, in the acceptance should be carried out two impoundment test, so that no leakage.
7. The floor drain and the flooding slope meet the design requirements, so as not to pour water, the joint is smooth and smooth, and there is no leakage.
8, the elevation of various floors of cement concrete ground floor, should consider the height requirements for re-decoration.

Space renderings Xuanguan renovation room space decoration design TV decoration home decoration style fashion small apartment renovation home

Former Holder

Former Holder,Single Former Holder,Former Holder Set,Double Former Holder

NINGBO DEMY (D&M) BEARINGS CO.,LTD , https://www.demybmtbearing.com

Posted on