Spring decoration advantages listen to experts how to say

Formulate Budget 1. Outline the budget for the preparation of decoration projects:

The architectural decoration project is an important part of the construction project. It includes interior and exterior decoration and facilities. The decoration project shall use the “fixed amount, market price” and a once-inclusive way to compile the budget for the decoration project.

Fixed amount: The amount of main materials used and the number of days of artificial labor determined in accordance with the relevant provisions of the design drawings and the estimated budget quota.

Machinery costs: Calculated mechanical costs are calculated according to the fixed mechanical costs.

Market price: The material price and wage unit price are calculated based on the market price.

The project direct fee is determined by the quota amount and market price, and the company's operating expenses, profits, taxes, etc. are calculated and the total construction cost of the project is calculated.

Second, the role of the budget for decoration works:

It is the basis for bidding, bidding and evaluation of construction units and construction companies.

It is the basis for signing the contract, drawing the project payment and project settlement for the construction unit and the construction company.

It is the basis for construction companies to plan, implement economic accounting, and assess business results.

Third, the decoration project budget preparation basis, steps and costs.

1. Based on:

Construction drawings, current quotas, unit price, standards, decoration construction organization design, budget manual and building materials manual, construction contract or agreement.

2. Preparation steps:

Familiar with the construction drawings; Calculate the amount of work; Calculate the direct cost of the project; Calculate other expenses; Check the check; Write the preparation instructions, fill in the cover, and bind the book.

3. The composition of the fee:

The cost of building decoration projects consists of direct engineering fees, business operating expenses and other expenses.

Direct fee: The direct fee includes labor costs, material costs, construction machinery usage fees, site management fees, and other expenses.

Corporate operating expenses: refers to the management fees and financial expenses incurred by the company's operating management and building decoration management departments.

Other expenses: There are mainly profits and taxes.

Villa design decorative door price

This casters series is a user-friendly design. The bracket is aluminum alloy, the wheel material is PA, and the surface treatment is spraying. Auto adjustable casters can not only help make stationary items easier to move, they can also help users change the height of the item for improved access and stability. With an adjustable height swivel caster, you can have the ultimate in flexibility. So this casters series apply to many fileds, such as medical equipment, vending machines, processing equipment, heavy machinery and so on. Our auto adjustable caster wheel options are always top quality and available at significant discounts. We also provide information about each product to get details about the load capacity, stem dimensions, height ranges, additional features, and more.

Our products is certify to high quality according to the international standards.

auto adjustable casters

Auto Adjustable Casters

Auto Adjustable Casters, Braked Adjustable Caster, Bolt Hole Swivel Adjustable Caster, Plate Swivel Adjustable Caster Wheel

Ningbo Mywin Caster Co., Ltd. , http://www.mywin-caster.com

Posted on