Many people who have been decorated have probably known that renovation usually takes 45 to 60 days, but for many owners, it takes almost two months to be too long. After the renovation, they need to be vacant for a few days. Diffuse and can't immediately stay. After buying the house, there were various reasons why the owners couldn't immediately enjoy the pleasure of staying in their new house nest. This feeling was no less than a scratch. Therefore, the impatient owners took notice of the renovation. To shorten the construction period in various ways, such as minimizing hydropower changes, customizing the cabinets and doors using urgency, avoiding the use of paints and solid wood doors, and so on. In fact, we want to reduce the construction period. The most important thing is to do it from the source. From the design effort! When designing, try to simplify the complicated process, reduce the interior changes, and make a simple home! So let's take a look at these scientific methods to shorten the construction period now!
1, design is the first step to save time |
If you want to effectively shorten the construction time, water and electricity should be changed as little as possible. If there are no special requirements, the changes to the water are usually smaller. Therefore, it is particularly important to change electricity.
First, try to simplify ceiling modeling. Once the ceiling shape is complicated, in order to ensure that the lighting and creating the atmosphere downlight and the number of switches will be virtually increased, this will also increase the difficulty and time of wire changes;
Second, it is best not to change the function of the initial setting of the living space. For example, if the bedroom and the living room or bedroom and the study place are exchanged or modified, the original position of the house's bolts and switches may be changed, and the movement is not too small. This will not only increase the renovation costs, but also extend the time for hydropower renovation. .
Hydroelectric renovation, tiling, measurement and verification of cabinets and doors, waiting for cabinets and doors to be made during the production of other processes, and finally the installation of doors, cabinets, floors, and sanitary ware. In these processes of renovation, the time spent on hydropower reform will have a direct impact. After the program's start time. It can be seen that the degree of difficulty in hydropower reform is one of the most important decisive factors in the length of the overall construction.
2, design and process details can not be ignored |
In fact, the installation of the main material should be considered from the beginning of the home renovation.
First of all, the installation of the main material involves circuit modification. Before the wooden door is installed, the influence of the wooden door switch on the lighting switch and socket shall be considered. If there is any influence, the switch or socket shall be removed during the renovation. The cabinets in the cabinets often block the sockets during installation. Therefore, you must fully consider before installing the cabinets and transfer the sockets to a suitable wall position.
Secondly, when the pipe gas is reformed, it is impossible to fully consider the installation position of the owner's cooker and cabinet when the pipe gas is initially taken. Therefore, in order to facilitate the use of the kitchen, many households need to perform gas pipelines before the cabinet and stove are installed. Transformation. This requires the owner and the gas company to contact the gas company to arrange for special technical personnel to come to the door, the owner must not arbitrarily change.
Construction delivery construction acceptance inspection decoration construction knowledge