Nanjing tile how much the United States and the United States seam seam construction steps and methods

As we all know, when laying tiles, there will be a gap between the tiles, and these gaps need to be filled with US grout, then, how much is the US grout a flat, what is the construction steps of the US grout? Here we will To explain in detail: how much money and flat tiles in the United States, Nanjing tile seam construction steps and methods? Hope we can give you some help and inspiration!

Nanjing tile how much the United States seamed a level:

Nanjing tile how much the United States seam a flat? First of all, the price of a tile US grout is generally around 70-80 yuan, a US-based grout of 00ML can fill a gap of 3 square tiles. Therefore, the price of US grout per square meter of tile is generally around 20-30 yuan. It is best for friends in need to go to the physical store for detailed consultation and understanding. Only a few of them will be able to take advantage of this.

Tiles and beautiful joints of the construction steps and methods:

Tools / Materials:

US grout, empty plastic bucket, glue gun, textured paper, quilting knife, spatula, vacuum cleaner, brush, bedding treasure, disposable gloves.

Construction steps:

1, first use a ruler to measure the length of the gap, so that it is easy to calculate the amount of material.

2, to remove the dust on the tile surface and crevices.

3, use a brush or vacuum cleaner to clean up the dust to clean, to ensure that there is no dust, no impurities during construction.

4. Before construction, apply textured paper on both sides of the gap, but do not stick it to the gap to ensure that the standards are the same.

5. Prepare ceramic mud, empty plastic bucket, glue gun, spatula and other tools.

6, remove the United States and evenly adjust the slurry, and then stir for 3 minutes, and then use the scraper into the gap in the construction.

7. Insert material evenly along the gap in the tile.

8. Use a spatula to level the material inside the gap.

9. Remove textured paper, but do not drop extra material on the floor.

10. Clean up the construction site and do not step on and dip water until the material is dry.

The beauty of the tile:

1, the gap to clean out more than 2mm depth.

2. When constructing, apply textured paper on both sides of the tile to ensure that the standards are the same.

3. When the construction is completed, tear off the textured paper in time and do not drop the extra material on the floor.

4, the material is not completely dry not to step on, water.

5, to place 24 hours to walk on it.

The article concludes: How much money is used for the seaming of the Nanjing tile and the related steps of the construction process and method of the tile seam are introduced here. In fact, the construction method of the US sizing agent is very simple, as long as the materials are prepared, the ground and the gap are cleaned. The dust in the step by step can be carried out by the above steps, friends in need, may wish to try it yourself.

Gate Guide Wheel

Gate Guide Wheel ,Rubber Guide Rollers For Slide Gates,Guide Rollers For Sliding Gates,Nylon Rollers For Sliding Gates

Jiaxing Gates Hardware Products Co.,Ltd , https://www.jxgateshardware.com

Posted on