General knowledge about installation and acceptance of bathroom equipment

To install a cast iron washbasin, draw a vertical line at the center of the discharge nozzle. Measure the height upward from the floor, draw a horizontal line into a crosshair, and draw a mark on the horizontal line of the washbasin. Then draw each mark. A vertical line, put the pot frame well, draw the screw hole in a diameter of 15 mm, 70 mm long hole.
1. Installation specifications for toilets (1) Take out the pipe plugs from the ground water outlet. After checking that there are no impurities in the pipes, clean the area around the nozzles.

(2) Align the outlet pipe of the toilet with the outlet pipe, place it flat, and draw a mark on the hole of the toilet bolt and remove the toilet.

(3) Insert a hole with a diameter of 20 mm and a depth of 60 mm at the imprint, insert a 10 mm diameter bolt into the hole, secure it with cement, align the eye of the toilet with the bolt, align it with the mark, and after the test, The toilet was removed. Put putty around the outlet of the toilet bowl and the nozzle of the water pipe, and then align the four bolt holes of the toilet with the bolt, lay it flat and align it. Put a rubber pad on the bolt and screw it on until the nut is tight.

(4) Align the back center of the toilet and draw a vertical line. Draw a horizontal line at a height of 800 mm from the ground. Draw a seal on the horizontal line according to the positions of the two side holes on the back of the tank. Play a diameter of 30 mm at the hole. 70 mm hole. Insert a bolt 10 mm in diameter and 100 mm in length into the hole and secure it with cement. Hang the back water tank on the bolts, align and align them, especially align with the center of the toilet bowl. Put a good rubber pad on the bolts, screw on the nuts, and tighten them to a moderate degree.

(5) When installing the backwater tank elbow, first remove the nuts of the backwater tank water outlet and the toilet water inlet, and put it back to back on the water elbow. The rubber pads are also placed on the sewage pipe. Insert the upper end of the water elbow into the drain of the back tank, insert the lower end into the water inlet of the toilet, push the pad to the nozzle, screw on the nut, straighten the water elbow and straighten it, and tighten it with the pliers. Moderate.

(6) When connecting the upper water with the eight-character door, the size of the water tank's drift gate should be measured firstly, and the short section should be prepared. The eight-character door should be installed, and the water inlet pipe should be installed. If the copper tube or plastic tube is cut off, it is necessary to use the mother of the lamp fork to bend the mother. Then the back of the drifting door and the eight-word door nut are put back on the copper tube or the plastic tube, and the tube is wrapped with oil-wool asbestos rope or lead-oil twine. Insert the drift door and eight-word door entrance and exit, tighten the nut.

2. Specification for washbasin installation (1) Installation washbasin: To install the washbasin on the rack, draw a vertical line in accordance with the median position of the drain nozzle, measure the height upward from the floor, draw a horizontal line on the wall, according to the face The width of the pot draws an imprint on the wall, hitting holes 120 mm deep. Drain the bricks and other debris from the hole, insert the expansion bolts into the hole, and pry with the cement. The fine tubing should be hung up. Put the bolts on the rubber pads and eye sockets, and put on the nuts, and screw them to the appropriate pipe end. Head over the basin fixing hole. Place the washbasin on the rack to find a flat surface. Attach a 4 mm diameter bolt to a horizontal iron bar, insert the upper end into the mounting hole, and insert the lower end into the tube rack. Put on the nut and tighten until tight.

(2) Install a cast-iron-frame washbasin. Draw a vertical line at the center of the discharge nozzle. Measure the vertical height upwards from the floor, draw a horizontal line into a crosshair, and draw a mark on the horizontal line according to the width of the washbasin. Each vertical line was drawn and the pot holders were set up. The screw hole was placed in a hole with a diameter of 15 mm and a length of 70 mm. The lead rolled into a roll and cut into a hole. Use the screws to fasten the basket to the wall. Place the washbasin on the rack, open the bolts of the movable frame, pull out the movable frame, and hook the rack on the washbasin hole. Inside, tighten the movable frame screws again, leveling and aligning.