09 version of the latest home renovation contract template

Employer (abbreviated as Party A):_______________
Contractor (B): _______________

According to the "Contract Law of the People's Republic of China", "Construction and Installation Project Contract Regulations", "The People's Republic of China Consumer Protection Law," "The People's Republic of China Price Law," and "The Protection of Consumers' Legal Rights and Interests Regulations," the People's Republic of China The Ministry of Construction (1997) No. 92 of the "Trial Measures for the Management of Home Decoration" and other relevant laws and regulations stipulate that in order to protect the legitimate rights and interests of both parties, the two parties shall reach the following agreement in accordance with the specific conditions of the project and shall abide by them. I. Overview
1. Party A’s decorated housing is legally resident. Party B is an enterprise legal person that has been approved by the municipal administration for industry and commerce and has been examined and approved by relevant departments of the Municipal Construction Committee as having a Civil Decoration "Qualification Certificate."
2. Decoration construction site: __ District (County)____________ (Village)___________________________.
3, housing structure: _____ room type ____ room _______ sets, construction area ___ square meters.

4. Decoration construction content: For details, see Attachment 1 "Construction Construction Contents Table".
5. Contracting methods: _____ (including contracted materials, contractors, and partial contracts).
6, the total price: ¥ ____ yuan, capital (RMB): _____ where:
Material fee: ______, labor cost: ______
Management fee: ______, design fee: ______
Garbage removal freight: ______, tax (3.41%): ____ other expenses: ______
With the approval of both parties, the contents of the construction shall be changed, and part of the project money shall be changed according to actual conditions.
7. Duration: Starting from ____________, _________, _______________, ____________, ___days.
Second, on the material supply agreement:
1. Materials provided by Party A: For details, see Attachment II, "Party A Provides Materials and Equipment Table". The materials and equipment that Party A is responsible for purchasing and supplying shall be qualified products that meet the design requirements and shall be delivered to the site on time. Party B shall go through the acceptance procedures. If Party B's materials or equipment are subject to quality problems or specification differences, Party B shall promptly submit to Party A written submissions. Party A still indicates that it is used, and the responsibility for the project losses shall be borne by Party A. After the materials supplied by Party A arrive at the site, Party B shall be responsible for safekeeping after acceptance by Party B. Party B may receive the storage fee of Party A's provided materials. The rates shall be agreed by both parties. Party B shall be responsible for compensation for losses caused by improper storage.
2. Materials provided by Party B: For details, please refer to Attachment 3 “Main Material Quotation Sheet”.
3. The decoration materials and equipment purchased by Party B for Party A shall be used in the residential decoration as stipulated in this contract, and shall not be used for other purposes without the consent of Party A. If Party B violates this provision, it shall compensate Party A twice the amount of the misappropriation materials and equipment price.
4. Materials and equipment supplied by Party B shall not be used if they do not meet the quality requirements or the specifications are different. If it has been used, Party B shall be responsible for the losses caused to the project. If the materials and equipment provided by Party B are inferior products, they shall be compensated to Party A twice as much as the materials and equipment.
Third, the project quality and acceptance of the agreement:
1. This project implements DBJ08-62-97 "Technical Specification for Residential Building Decoration Engineering", DB31/T30-1999 "Residential Decoration Acceptance Standard" and other local standards and quality assessment acceptance standards formulated by the municipal construction administrative department.
2. The project is designed and constructed by ___.
3. The quality of the materials and equipment provided by Party A will be unqualified and affect the quality of the project. Party A shall bear the rework costs and the construction period will be postponed.

4. Due to the quality accident caused by Party B, Party B shall bear the cost of rework, and the duration shall not change.

5. During the construction process, Party A shall contact Party B in advance when designing modification opinions and adding or removing project items. After signing the “Project Change Sheet” (see Annex for details), the construction of the project can only be carried out by This influences the completion date of both parties A and B. Where Party A personally negotiates with the workers all the consequences of altering the construction content, Party A shall be responsible for causing losses to Party B, and Party A shall compensate.
6, project acceptance. Both Party A and Party B shall go through the inspection and acceptance formalities of the concealed and intermediate works in a timely manner. Party A shall not participate in the inspection and acceptance on the date set by the appointment. Party B shall organize the inspection and acceptance by Party A. Party A shall acknowledge it. Afterwards, if Party A requests reinspection, Party B shall conduct the retest as required. If the re-inspection is qualified, the cost of re-inspection and rework will be borne by Party A, and the duration will also be postponed.
7. Completion of the project: Party B shall notify Party A of acceptance within three days in advance. Party A shall organize the inspection and acceptance within three days after receiving the notice, and go through the procedures for inspection and acceptance handover (for details, please refer to the appendix “Project Quality Acceptance Checklist”). If Party A cannot organize inspection within a specified time, Party B shall notify Party B in a timely manner and set an acceptance date. In case of acceptance through completion, Party A shall acknowledge the original completion date and bear Party B’s care costs and other related expenses.
Fourth, related to production safety and fire safety agreement:

The description of the construction drawings provided by Party A and the construction site shall meet the requirements for fire prevention and accident prevention, which mainly include the unimpeded and qualified electric lines, gas pipelines, tap water and other pipelines. Party B shall take necessary safety protection and fire prevention measures during construction to ensure the safety of operators and neighboring residents, and prevent accidents such as clogging of pipelines, leakage of water, power outage, and destruction of articles of neighboring residential houses. In the event of the above-mentioned circumstances, Party A's responsibility, Party A's responsibility and compensation; belongs to Party B's responsibility, Party B is responsible for repairs and compensation.
Fifth, the project price and settlement agreement:
1. The payment method of the project is listed in the following table:

Payment time
Payment percentage
Amount
Recognition of budget design
The date of signing the contract
1,000 yuan, deducted on the second payment
After signing the contract
2 to 5 days before construction starts 65%
in construction

More than half of the progress
30 yuan
Completion acceptance
5% of the day
Increase project

Signing the project change form
100 yuan
Note: If the tangible market for decoration works is otherwise stipulated, it may be handled in accordance with market regulations.
2. Project Settlement: Please refer to Appendix 6 “Project Settlement Statement” for details.
3, the project warranty period of one year. All construction costs must be settled. Both parties A and B can sign the “Project Warranty” (see Annex 7 for details), and the warranty period starts from the date of acceptance of the completion certificate.
4. Both parties shall issue receipts for payment transactions, and an invoice must be issued at the end of construction.
Sixth, other matters
1. Work of Party A: (1) Party A shall provide Party B with ____ copies of construction drawings or practices approved by the realty management department one day before the commencement of work, and Party B shall perform on-site delivery to Party B. All vacated or partially vacated houses to clear obstacles affecting construction. Measures shall be taken to protect furniture, furnishings, etc. that are left behind in houses that can only be partially vacated. Provide Party B with the necessary conditions for water, electricity, etc. required for construction, and explain the precautions for use. (2) Doing a good job of coordinating the use of common parts and operations and affecting the relations between neighbors during construction. (3) If it is really necessary to dismantle the original building structure or design pipeline, it shall be responsible for going through the corresponding examination and approval formalities with the local housing management department or property management department and bear the relevant expenses.
2. Work of Party B: (1) Participate in the construction drawings or practices organized by Party A to explain the site. (2) Designate ____ as Party B's site representative and be responsible for fulfilling the contract. Organize construction according to requirements, guarantee quality, quantity, complete construction tasks on schedule, solve all matters that Party B is responsible for, and Party B shall approve their actions. In case of replacement of personnel, Party B shall promptly notify Party A in writing. (3) The original building load-bearing structure and various common equipment pipelines shall not be arbitrarily removed without the consent of Party A and the approval of the local housing management or property management department.
VII. Liability for breach of contract:

1. Party A shall compensate Party B for losses due to work stoppages or work stoppages due to Party A's reasons for delaying the start of work or stop work. Each time a work stoppage or work breaks, Party A shall pay Party B_____; Party A fails to pay as agreed in the contract. , Every overdue day, according to __% of overdue payment of liquidated damages.
2. Due to the overdue completion of Party B's reasons, Party B shall pay Party A's breach of contract damages according to ___% of Party A's payment once each one day expired.
3. Party A did not go through relevant formalities and forced Party B to dismantle the original building load-bearing structure and shared equipment pipelines. Party A's losses and accidents (including fines) were responsible and responsible for Party A's losses.
4. Party B shall arbitrarily dismantle and renovate the original building load-bearing structure or shared equipment pipeline. The resulting losses or accidents (including fines) shall be the responsibility and responsibility of Party B.
Eighth, dispute handling methods:
1. When there is a dispute between the two parties on the quality of the project, with the text of this contract and the unified invoice issued by the construction company, they can consult with the Home Decoration Committee of the Shanghai Building Decoration Association for mediation, or to the district or county administrative department of construction or the consumer. Association vote. 2. When the parties are reluctant to resolve through negotiation or mediation, or if consultation or mediation fails, they can be directed in accordance with this contract.

Villa design entrance decoration decoration residential house decoration design home decoration

There is a limited number of on-site group buying activities. Register now

Related Reading
Suzhou Family Home Decoration Decoration Contract Demonstration Text

Suzhou Family Home Decoration Decoration Contract Demonstration Text

2009-11-12 14:51:06
All-inclusive contract template reference

Employer (abbreviated as Party A): __________________________________ Contractor (referred to as Party B): __________________________________ According to the "Contract Law of the People's Republic of China", "The Consumer Protection Law of the People's Republic of China", "PRC Price

2012-08-30 16:45:18
Family Room Decoration Decoration Design Contract Text Four

Family Room Decorating Design Contract Text

2009-09-23 10:50:31
Decoration materials procurement contract template

Pursuant to the "Contract Law of the People's Republic of China" and other relevant laws and regulations, the buyer and the seller reached an agreement on the purchase and sale of building materials on the basis of equality, voluntariness, fairness and good faith.

2011-04-13 14:42:15
For safety, family decoration is not easy to change the pipeline

During the renovation, the heating pipes were demolished and changed. The situation of the upper and lower water pipes was more common. According to reports, there are many drawbacks to dismantling the heating system indiscriminately. After the originally designed heating is changed, the pressure will change. After the heat balance is broken, the heating will be out of balance, causing the houses to be hot and cold. After the change of heating, it is difficult to ensure no water leakage. The original design is more reasonable and can be fixed as far as possible. Changes in the upper and lower water pipelines often have problems with leakage and water pollution,...

2012-03-14 11:58:36
There have been 0 comments


submit

Recommended Area Popular Atlas Popular Information Popular Questions and Answers Hot Products
Aisle entrance decoration home decoration entrance design decoration entrance entrance decoration Chinese style entrance decoration villa entrance decoration bedroom entrance entrance decoration design decoration entrance design home decoration design software simple home decoration entrance decoration design family entrance style entrance design residential decoration design house decoration entrance design home decoration paint brand bath Room Top 10 Brands Overall Shower Room Brand Cupboard Doors Brand Baskets Top Ten Brands Domestic Bathroom Brands Home Living Room Partitions China Top Ten Sanitary Knives Ten Brands Oil Tings What Makes A Good Hallway Design Renderings Hallway Decoration Renderings Hallway Entrance Decoration Renderings Hallway Effects Picture Corridor Ceiling Decoration Effect Picture Corridor Ceiling Decoration Effect Picture Decorative Wine Frame Effect Picture Decoration Design Picture Decoration Picture European Style Decoration Case European Style Decoration Ceiling European Style Decoration How Much Home Decoration European Style Simple European Style Decoration European Style Wallpaper European Style Living Room European Style Style wall decoration European style decoration kitchen brush paint how much money a square meter living room ceiling with what material is good Ou Lin sink how to the bedroom what color is good Smick tile how Honghong resistant floor how What good material curtain sofa What makes a good SITA floor how to Olin Olin kitchen cabinets Kitchen Olin Olin sound of camphor wood panels integrated board wardrobe integrated integrated board-level integration EO sound of sheet metal plate

Prefab House is made of light steel as Steel Structure and sandwich panels for wall and roof. The sandwich panels can be polystyrene, polyurethane, rock wool and fiber glass sandwich panels for insulation. As a standardized construction product, Prefabricated steel frame house has below main features: Dry installation, no construction garbage caused; Environment protective materials adopted, repeated use and low cost; Flexible size and easy to assemble and disassemble with elegant appearance; Safe and durable. 2 storey house is suitable for temporary buildings such as dormitory, canteen, recreation room, washing.

Except prefab house,we have prerabricated warehouse,prefab steel hosue,Prefabricated Steel Structure House,Prefab Steel Shed,Prefabricated Building,Prefabricated Steel House ect.

Prefab House

Prefabricated Steel Structure House,Prefab Steel Shed,Prefabricated Building,Prefabricated Steel House,Prefab Steel House,Prefabricated Warehouse

Shandong Hongtian Heavy Industries Co., Ltd. , http://www.hy-steelbuilding.com

Posted on